Question 01
Do the certificates and lots match the order?
AnswerThe documents received are matched against your checklist at receiving.
I want to…
ManufacturingYour plant produces.
IndustrialYour facilities run.
ConstructionYour job sites move forward.
TransportYour trucks roll.
AerospaceEvery part has a history.
Professional servicesYour expertise is billable.
FinanceYour advisors guide clients.
LegalYour firm advises.
MedicalYour team provides care.Industry: Aerospace
For companies of 15 to 500 employees.
Traceability, revisions and quality files: linked to each part, according to each person’s access rights.
Engineering, manufacturing and quality decide. HUB AI prepares.
Three questions · Aerospace
Question 01
AnswerThe documents received are matched against your checklist at receiving.
Question 02
AnswerThe affected work orders, instructions and files are flagged for engineering.
Find it in the scene: Engineering and configuration management
Question 03
AnswerThe index is prepared and the missing documents or fields stand out.
LimitHUB AI certifies nothing and releases no part.
Let’s start from a real part file.
Book my DiagnosticYour private foundation
Engineering files and sensitive technical data are processed in Canada, on supercomputers reserved for your company. A model can learn your ways of documenting there, from validated examples.
An environment dedicated to your company, hosted at Hub AI, in Quebec. It is not shared with other clients; your teams access it over the web.
Drawings, configuration files and sensitive technical data stay processed in Canada, in this environment.
Your processing runs on supercomputers reserved for your company. That same power is also used to train your model. HUB AI and its agents are available 24 hours a day, 365 days a year. This power is yours: you use it as you need it, with no bill for each job.
Engineering and inspection files are processed on capacity reserved for your company.
HUB AI can train a model on your ways of working, from examples validated by your teams. It is trained and hosted on these same machines, in Quebec, then tested before it goes into service. Your examples train only your model, and stay walled off, in Canada.
The model can learn your technical vocabulary and your ways of documenting, from examples validated by your teams.
The Diagnostic will tell whether a tailored model is the right lever, or whether memory and agents are enough.
Department shown: Engineering and configuration management
The work orders, instructions and files affected by a new revision are flagged for engineering; the authorized people confirm the impacts.
In aerospace, each team adds a page to the part’s file. One agent per team, a record of every action.
“Which work orders are affected by a new revision?”
The revision, linked to the affected work orders. The work orders, instructions and files affected by a new revision are flagged for engineering; the authorized people confirm the impacts.
“Which instruction applies to this work order?”
The approved instruction, on the right work order. Find the approved instructions that match the work order and its revision.
“Is the first article file complete?”
Missing documents and fields, flagged. The index of the first article file is prepared and the missing documents or fields stand out. The requirements (including 9102 when it is required) depend on the contract and the product; measurements and signatures stay with the authorized people.
“Do the certificates and lots match the order?”
Certificates, lots and order matched. At receiving, the certificates and lots received are matched against the order and your checklist. The controlled goods regime applies depending on the products and data.
“What evidence is missing on this subassembly?”
The status of the assembly, prepared. Prepare the status of the components, operations and expected evidence.
The industry’s other functions, in addition to those shown in the scene. Each example is a proposed path: it depends on the connected sources, the access rights and the appropriate tools, and the person responsible reviews or decides.
Organization represented: Civil manufacturer, equipment manufacturer or parts supplier. Variants to document: Maintenance and repair; in-service support; security; exports and controlled data where applicable.
Prepare a program review with milestones, expected documents and supplier delays.
Gather drawings, routings and tooling needs for a new part number.
Compare the evidence received with the documented requirements of the supplier file.
Group deviations, analyses, actions and evidence of completion for the review.
Bring together applicable requirements, available results and open anomalies.
Link the instruments used to the available calibration evidence.
Prepare the delivery index with part numbers, lots and requested documents.
Indicators to measure: First article files returned for completeness; time to identify the impacts of a version; evidence missing before release. No quantified gain has been established.
Responsibilities: Transport Canada’s Standard 561 concerns approved manufacturers and does not apply indiscriminately to every subcontractor. Measurements, signatures, concessions, declarations of conformity and releases stay with the authorized people.
Bring together the blocked files, their owner, the source documents and the decision expected, to prepare the management meeting.
Prepare the onboarding of a new employee with the tasks, requested access and documents that match their position.
Find an approved procedure, its version and the person to consult; prepare a training path by role.
Match order, receipt and invoice; present the discrepancies to the person responsible before payment.
Prepare a proposal from a request and authorized references; keep the commitments made to the client.
Group the requests tied to a file and prepare a reply with the real status of the work.
Compare offers against defined criteria and track the supplier’s missing documents.
Link an incident to the equipment, the symptoms already observed and an authorized procedure to help the technician.
Find documents by file and by access rights; track access requests and the applicable retention dates.
Flag contract deadlines and gather the documents for renewal or for review by the person responsible.
Link an event to a corrective action, an owner and evidence of completion.
Prepare maintenance work and track service contracts, equipment and scheduled inspections.
Private infrastructure
Some engineering and production files are subject to strict access rules. HUB AI’s private infrastructure keeps their processing in Canada, in an environment that serves only you.
These references describe general obligations; they are not legal advice. Private infrastructure does not guarantee compliance on its own: compliance depends on your practices, your contracts and the assessment made for your organization.
The Diagnostic tells you where HUB AI starts in your company.
Play with the sphere. Beat HUB AI in three points.
You 00 HUB AI
Three points to win. Mouse or arrow keys. Esc to stop.Three points to win. Slide your finger to move your paddle.
You won
Well done. Now let’s talk about your company.
Understand how work really gets done at your company, before building anything. The Diagnostic takes 3 to 4 weeks.
[Offer terms, to be specified by HUB AI.]
If your email program opened, reread the letter and send it. Otherwise, copy it and send it to sales@hubaifactory.com, or call 514 556-8916.